14.10.10

34. glob number one.


the decision was made after filling, to discard the large central glob. Its tubular form had not been manipulated to the level which we had anticipated and we felt it would detract from the overall quality of the installation.

6.10.10

31. size and paste making.





30. knots and connections













29. structure practice assembly.

With a great thanks to Roll Forming Services for providing us with our supporting frame structure, we were able to test the processes linked to the assembly of our project. We were able to achieve a height of 4m using manpower alone, and look forward to the assembly of the 8m tall frame on the night of the exhibition.